Was this page helpful?
Caution
You're viewing documentation for a previous version of ScyllaDB Open Source. Switch to the latest stable version.
This document is a step by step procedure for upgrading from Scylla 4.6 to Scylla 5.0, and rollback to version 4.6 if required.
This guide covers upgrading Scylla 4.6 to Scylla 5.0 on Ubuntu 20.04. See OS Support by Platform and Version for information about supported versions.
A ScyllaDB upgrade is a rolling procedure which does not require full cluster shutdown. For each of the nodes in the cluster, you will:
Check the cluster’s schema
Drain the node and backup the data
Backup the configuration file
Stop ScyllaDB
Download and install new ScyllaDB packages
Start ScyllaDB
Validate that the upgrade was successful
Apply the following procedure serially on each node. Do not move to the next node before validating that the node you upgraded is up and running the new version.
During the rolling upgrade, it is highly recommended:
Not to use the new 5.0 features
Not to run administration functions, like repairs, refresh, rebuild or add or remove nodes. See sctool for suspending ScyllaDB Manager (only available for ScyllaDB Enterprise) scheduled or running repairs.
Not to apply schema changes
Note
Before upgrading, make sure to use the latest ScyllaDB Monitoring stack.
Make sure that all nodes have the schema synced before the upgrade. The upgrade will fail if there is a schema disagreement between nodes.
nodetool describecluster
Before any major procedure, like an upgrade, it is recommended to backup all the data to an external device. In Scylla, backup is done using the nodetool snapshot
command. For each node in the cluster, run the following command:
nodetool drain
nodetool snapshot
Take note of the directory name that nodetool gives you, and copy all the directories having that name under /var/lib/scylla
to a backup device.
When the upgrade is completed on all nodes, remove the snapshot with the nodetool clearsnapshot -t <snapshot>
command to prevent running out of space.
Back up the scylla.yaml
configuration file and the ScyllaDB packages
in case you need to rollback the upgrade.
sudo cp -a /etc/scylla/scylla.yaml /etc/scylla/scylla.yaml.backup
sudo cp /etc/apt/sources.list.d/scylla.list ~/scylla.list-backup
sudo service scylla-server stop
Before upgrading, check what version you are running now using dpkg -s scylla-server
. You should use the same version in case you want to rollback the upgrade. If you are not running a 4.6.x version, stop right here! This guide only covers 4.6.x to 5.0.y upgrades.
To upgrade ScyllaDB:
Update the Scylla deb repo to 5.0.
Install:
sudo apt-get clean all sudo apt-get update sudo apt-get dist-upgrade scylla
Answer ‘y’ to the first two questions.
sudo service scylla-server start
Check cluster status with nodetool status
and make sure all nodes, including the one you just upgraded, are in UN status.
Use curl -X GET "http://localhost:10000/storage_service/scylla_release_version"
to check the Scylla version.
Check scylla-server log (by journalctl _COMM=scylla
) and /var/log/syslog
to validate there are no errors.
Check again after two minutes to validate no new issues are introduced.
Once you are sure the node upgrade is successful, move to the next node in the cluster.
See Scylla Metrics Update - Scylla 4.6 to 5.0 for more information.
Note
Execute the following commands one node at a time, moving to the next node only after the rollback procedure is completed successfully.
The following procedure describes a rollback from Scylla 5.0.x to 4.6.y. Apply this procedure if an upgrade from 4.6 to 5.0 failed before completing on all nodes. Use this procedure only for nodes you upgraded to 5.0.
ScyllaDB rollback is a rolling procedure which does not require full cluster shutdown. For each of the nodes you rollback to 4.6, you will:
Drain the node and stop Scylla
Retrieve the old ScyllaDB packages
Restore the configuration file
Reload systemd configuration
Restart ScyllaDB
Validate the rollback success
Apply the following procedure serially on each node. Do not move to the next node before validating the node is up and running the old version.
nodetool drain
nodetool snapshot
sudo service scylla-server stop
Restore the 4.6 packages backed up during the upgrade.
sudo cp ~/scylla.list-backup /etc/apt/sources.list.d/scylla.list sudo chown root.root /etc/apt/sources.list.d/scylla.list sudo chmod 644 /etc/apt/sources.list.d/scylla.list
Install:
sudo apt-get update sudo apt-get remove scylla\* -y sudo apt-get install scylla
Answer ‘y’ to the first two questions.
sudo rm -rf /etc/scylla/scylla.yaml
sudo cp /etc/scylla/scylla.yaml-backup /etc/scylla/scylla.yaml
It is required to reload the unit file if the systemd unit file is changed.
sudo systemctl daemon-reload
sudo service scylla-server start
Check the upgrade instructions above for validation. Once you are sure the node rollback is successful, move to the next node in the cluster.